Upgraded multiple Synchronous Motor Control Field Panels. Using GE 869 relays for control has resulted in lower installation cost, less plant down time and easier equipment monitoring. (Video of Upgrded Sync Panel Control System)
Upgraded several Electrical Distribution rooms. Specify new equipment, design new rooms, supervise installation and support startup. We can work directly with your local contractors for an easy upgrade.
By analyzing the power usage for a major industrial facility, it was determined they qualify for tax-except status. The exception has resulted in thousands of dollars in annual savings.
Visited over 100 customer sites all over the US, inspect electrical equipment and build distribution model. Using the latest IEEE 1584 standard provide recommendations for lowering incident energy levels. Most facilities can lower energy levels to 40 cal/cm^2 with minor relay adjustments. Equipment is labeled during the site visit, so customers are not tasked with interpreting data.
Schedule, monitor and interpret maintenance reports based on NFPA 70B. Analyze several facilities IRI, Oil Sample and Breaker/ Relay programs.
A license professional engineer is available 24/7 for remote or onsite support for most electrical issues. With short notice a qualified engineer can arrive at you location to support your facility.